The brief
The extension was built and plastered; the client needed everything from the floor up. The priority was one uninterrupted floor with no step or strip between old and new.
What we did
- Substrate surveyed over a 2 m straightedge and levelled to a large-format tolerance
- Movement joint planned at the junction of old and new structure, hidden in a grout line
- 1200×1200 porcelain, back-buttered, levelling clips on every joint
- Trade units assembled and fitted; quartz worktop templated and fitted
- Metro splashback in a one-third bond, set from the hob centre line


BeforeAfter


BeforeAfter


BeforeAfter


BeforeAfter
“You cannot tell where the old kitchen stops and the extension starts. That was the whole point and they nailed it.”
More projects
Talk to us
Book a consultation
Send a couple of photos and where you are. We’ll call back the same working day with a straight answer on whether we’re the right fit and a rough range.
Where we work
All London boroughs, and north-west from Harrow out to Rickmansworth, Amersham, Chesham and the Chiltern towns around them.
